For equipment expected to have a long working life in a critical system, and in case the supplier can no longer provide them, agencies should arrange to acquire: the necessary licences; information for producing spare parts, components and assemblies; testing equipment; and technical assistance agreements.
This control maps to 1 controls across 1 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.
Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.
The graph holds this control, the 1 it maps to, and the evidence behind each claim, over MCP and REST.