For an identified primary control center that operationally controls a verified station or substation and is not under the Transmission Owner's operational control, notify the Transmission Operator that controls it of the identification and the R2 completion date within seven calendar days of completing R2.
The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.