Identify each medium impact BES Cyber System at each asset by applying Attachment 1, Section 2: generation of 1,500 MW or more at one plant, 1,000 MVAR reactive resources, generation designated by the Planning Coordinator or Transmission Planner, Transmission Facilities at 500 kV or above, 200 to 499 kV stations with an aggregate weighted value above 3,000, IROL-critical facilities, Nuclear Plant Interface Requirement facilities, generation interconnection facilities, IROL-affecting SPS, RAS or automated switching, UFLS or UVLS of 300 MW or more, and Control Centers of Generator Operators (1,500 MW), Transmission Operators and Balancing Authorities (1,500 MW) not rated high.