The Acquirer or the Government Quality Assurance Representative (GQAR) may reject the Supplier's QMS as applied to the contract. The documented scope, internal audit records, self-assessments and other objective evidence of compliance and effectiveness are kept readily available to them; if the QMS is rejected, the Supplier puts forward corrections and changes to the system by a date agreed with them, and any penalties follow the contract. SRD.1: rejection is kept for systematic failures or serious threats to delivery (major audit findings, escapes past final inspection) and is a contract breach with nationally set penalties. SRD.2: against AS9100D 4.3 and 4.4 the NATO part is the right to verify and reject despite a 9100 certificate. Base clause: ISO 9001:2015 4.3 and 4.4 (scope, QMS and its processes).
The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.