NASA NPR 7150.2D Software Engineering Requirements
Chapter 3: Software management requirements – NASA NPR 7150.2D Software Engineering Requirements

NASA NPR 7150.2D Software Engineering Requirements SWE-179: Respond to IV&V issues and risks and track them to closure

What does SWE-179 require?

Where IV&V is performed, the project manager responds to the issues and risks IV&V submits and tracks them until closed.

Maintained by Gerard Blokdyk

Other controls in Chapter 3: Software management requirements – NASA NPR 7150.2D Software Engineering Requirements

Query this from an agent

The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.