The organisation must transfer the design correctly into production methods and procedures. Brazil: the design must not be released to production until the designated people approve it, after reviewing every record required in the design history file confirming the file is complete and the final design is consistent with the approved plans, with the release, date and signature documented (RDC 665/2022 Arts 58, 61). Clauses: ISO 13485:2016 4.2.1, 4.2.3, 7.3.8; RDC 665/2022 Arts 52, 54 to 58, 61; MO169 Arts 6, 7-2, 35-2.
The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.