Design reviews must take place at suitable stages under the design plan, with participants from the functions concerned with the stage and any specialists needed, and results recorded. Design changes must be reviewed for their effect on constituent parts and on product already made and delivered, with the results kept. Clauses: ISO 13485:2016 7.3.2, 7.3.5, 7.3.9; TG(MD)R Sch 3 Pt 1 cl 1.4(5)(c)(i); RDC 665/2022 Arts 50, 60, 61; MO169 Arts 6, 30, 33, 36-1.
The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.