Prerequisite (required, no points); applies to all eight BD+C adaptations. Prepare and carry out a plan controlling erosion and sedimentation from every construction activity, one that conforms to the 2017 EPA Construction General Permit or the local equivalent, whichever is stricter, applied regardless of project size, and describe the measures implemented.
The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.