The evaluation protocol is where an auditor's question becomes answerable: did this run evaluate the circuit that was agreed, with the labels that were issued, and nothing else? If the protocol leaves no record, the answer is a promise. If it leaves a record, the record is the evidence.
The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.