The report should set out the risk treatment plans prepared under 6.4.5: the option chosen per risk, the controls, the residual risk, the owners and the timing, and management's acceptance of the residual risk.
The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.