ISO/IEC 17020:2012 Requirements for the operation of various types of bodies performing inspection
Clause 8: Management system requirements (Option A and Option B) – ISO/IEC 17020:2012 Requirements for the operation of various types of bodies performing inspection

ISO/IEC 17020:2012 Requirements for the operation of various types of bodies performing inspection 8.5.2: Management review inputs

What does 8.5.2 require?

Review inputs include results of internal and external audits, feedback from clients and interested parties on fulfilment of the standard, status of preventive and corrective actions, follow-up from previous reviews, fulfilment of objectives, changes that could affect the system, and appeals and complaints.

Maintained by Gerard Blokdyk

What else in your programme already covers this

This control maps to 1 controls across 1 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.

Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.

Other controls in Clause 8: Management system requirements (Option A and Option B) – ISO/IEC 17020:2012 Requirements for the operation of various types of bodies performing inspection

Query this from an agent

The graph holds this control, the 1 it maps to, and the evidence behind each claim, over MCP and REST.