The tubing must be flexible and clear or translucent enough for the air and water interface to be seen as bubbles pass with normal or corrected vision, and must measure at least 1 500 mm between the distal end and the drip chamber, counting any injection site and the male conical fitting.
The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.