If one site carries a major nonconformity and acceptable corrective action is not in place by the agreed date, the body withholds or does not continue certification of the entire multi-site organisation until that corrective action is acceptable.
The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.