ISO 19650 - Organisation and Digitisation of Information about Buildings and Civil Engineering Works (BIM)
ISO 19650-1:2018 concepts and principles – ISO 19650 - Organisation and Digitisation of Information about Buildings and Civil Engineering Works (BIM)

ISO 19650 - Organisation and Digitisation of Information about Buildings and Civil Engineering Works (BIM) 1:8.1: 8.1 Principles of delivery team capability and capacity

What does 1:8.1 require?

The appointing party should assess whether the prospective delivery team has the capability (the ability to do the work, through experience, skill and technical resources) and capacity (the ability to finish it in the time required) to satisfy the information requirements. The appointing party, the team itself or an independent party may carry out the assessment; the team should be told its scope, and it should be finished before appointment, possibly in stages such as prequalification. Under frameworks, the scope may be narrowed to what is relevant or repeated periodically.

Maintained by Gerard BlokdykControl text last updated

What else in your programme already covers this

This control maps to 1 controls across 1 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.

ISO 9001:2015 · 1 control

Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.

Other controls in ISO 19650-1:2018 concepts and principles – ISO 19650 - Organisation and Digitisation of Information about Buildings and Civil Engineering Works (BIM)

Query this from an agent

The graph holds this control, the 1 it maps to, and the evidence behind each claim, over MCP and REST.