How complex these functions are should match how large and complex the asset or portfolio is. They should be assigned throughout the asset life cycle without gaps, with succession planning, because many organizations and individuals will perform them in turn. Asset information management, assigned from the very beginning, leads the validation of information from each appointed party and its authorisation into the AIM, and should take part in every project stage so that operation and maintenance information is handed over.
This control maps to 1 controls across 1 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.
Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.
The graph holds this control, the 1 it maps to, and the evidence behind each claim, over MCP and REST.