Cutting and then restoring the power supply only interrupts the intended function; basic safety and essential performance are kept, tested by interrupting and restoring the relevant supplies, which may need several durations and equipment states.
The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.