Each AMO has facilities and a work environment appropriate to the tasks, the technical data, equipment, tools and material for its scope, suitable secure and environmentally controlled storage, a shelf-life program with controlled limits, and a receiving inspection program verifying certification, condition and conformity of incoming material (MNT 4.6.1 to 4.6.5).
This control maps to 1 controls across 1 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.
Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.
The graph holds this control, the 1 it maps to, and the evidence behind each claim, over MCP and REST.