Each AMO performing maintenance for the Operator has an accountable manager acceptable to the Authority responsible for the organization, appropriate post holders responsible for compliance and quality, and enough staff to plan the work, carry it out, supervise and inspect it and release it (MNT 4.2.1 to 4.2.3).
This control maps to 1 controls across 1 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.
Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.
The graph holds this control, the 1 it maps to, and the evidence behind each claim, over MCP and REST.