A quality assurance program audits and evaluates the cabin operations management system and functions at planned intervals, significant issues go to management review, findings are addressed through root cause and corrective action, and audit planning provides the intervals and resources (CAB 1.9.1 to 1.9.4).
This control maps to 1 controls across 1 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.
Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.
The graph holds this control, the 1 it maps to, and the evidence behind each claim, over MCP and REST.