GLOBALG.A.P. Integrated Farm Assurance (IFA) Standard v6
Postharvest handling (FV-GFS 33) – GLOBALG.A.P. Integrated Farm Assurance (IFA) Standard v6

GLOBALG.A.P. Integrated Farm Assurance (IFA) Standard v6 FV-GFS 33.04.01: FV-GFS 33.04.01 A pest management plan is in place and implemented.

A plan exists and is applied to watch for and control pests in packing and storage areas, and what can be seen on site confirms that the monitoring and the corrective steps are working.

Maintained by Gerard BlokdykControl text last updated

What else in your programme already covers this

This control maps to 1 controls across 1 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.

  • 4.14.2 4.14.2 A competent pest contractor or trained staff, with a documented, risk-based inspection frequency and defined service scope

Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.

Other controls in Postharvest handling (FV-GFS 33) – GLOBALG.A.P. Integrated Farm Assurance (IFA) Standard v6

Query this from an agent

The graph holds this control, the 1 it maps to, and the evidence behind each claim, over MCP and REST.