The system can generate the information for the reports the regulatory body requires, on demand and for daily, month-to-date, year-to-date and life-to-date intervals at least, each report showing the operator, the interval and the generation date and time and indicating No Activity when the period is empty; the regulator may require further reports from the maintained information.
The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.