GLI-33 - Gaming Laboratories International Event Wagering Systems
Chapter 2: System requirements (clock, control program, wagering and player account management, wagering instruments, location, information to be maintained, reporting) – GLI-33 - Gaming Laboratories International Event Wagering Systems

GLI-33 - Gaming Laboratories International Event Wagering Systems 2.3.4: 2.3.4 Shutdown and Recovery

The system performs a graceful shutdown and allows automatic restart on power-up only once the program resumption routines, self-tests among them, have finished without error, all critical control program components are authenticated by an approved method and communication with every component needed for operation is established and likewise authenticated.

Maintained by Gerard BlokdykControl text last updated

What else in your programme already covers this

This control maps to 1 controls across 1 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.

Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.

Other controls in Chapter 2: System requirements (clock, control program, wagering and player account management, wagering instruments, location, information to be maintained, reporting) – GLI-33 - Gaming Laboratories International Event Wagering Systems

Query this from an agent

The graph holds this control, the 1 it maps to, and the evidence behind each claim, over MCP and REST.