What does 6.2.12 require?

The regulated company takes the computerized system out of service, moving its data to a successor system where relevant, through the withdrawal, decommissioning and disposal activities in section 4.4. It works to a retirement plan that deals with keeping data and records, migrating, archiving or destroying them, verification, the end of support, change management, scheduling and carrying out the work, and it issues a retirement report, as Appendix M10 describes.

Maintained by Gerard BlokdykControl text last updated

What else in your programme already covers this

This control maps to 1 controls across 1 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.

Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.

Other controls in Chapter 6: Regulated company activities (governance and system-specific activities) – GAMP 5 - Good Automated Manufacturing Practice

Query this from an agent

The graph holds this control, the 1 it maps to, and the evidence behind each claim, over MCP and REST.