When the project ends, a computerized system validation report is written that sums up the work done, departures from the plan and actions still open or taken to correct problems, and that gives a verdict on whether the system is fit for the use intended. For some systems, simple or low-risk ones for example, planning may have concluded that no separate report is needed. Putting the system into the operating environment follows a documented, controlled process, as Appendix M7 and section 4.2.4 describe.