Before transporting or offering hazardous waste for off-site transport, the generator must package it in accordance with the applicable DOT packaging regulations in 49 CFR parts 173, 178 and 179.
The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.