Aim: describe the software from the most abstract level down to detailed refinements, as the frame for demonstrating the safety achieved and for later maintenance. The document requirements of Table A.1 are met to the extent the integrity level requires. Table A.1 is ordered as an idealised waterfall, not a schedule to follow strictly: phases may overlap, provided verification and validation show that inputs and outputs, documents and software, stay consistent inside and across phases.