Process assurance should ensure the hardware plans are available as set in planning and the PHAC; reviews are held per plan and actions closed; deviations from plans and standards are detected, recorded, evaluated, approved, tracked and resolved; transition criteria are satisfied per plan (audits being an effective method for these); an inspection such as a first article inspection confirms the item is built to its design data; records of process assurance, including assessment of design activity completion, are produced; and subcontractor processes are consistent with the hardware plans.
This control maps to 3 controls across 2 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.