Verification of the parameter data item file is shown to be complete, every element covered. Table A-5 objective 9, described in 6.6.b; applies at levels A, B, C, independence required at levels A, B; activities 6.6; outputs Software Verification Results.
The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.