DO-178C / ED-12C - Software Considerations in Airborne Systems
Table A-5: Verification of outputs of software coding and integration processes – DO-178C / ED-12C - Software Considerations in Airborne Systems

DO-178C / ED-12C - Software Considerations in Airborne Systems A-5.8: Parameter data item file content correct and complete

Every element of each parameter data item file is correct and none is missing, checked against its structure and the values the requirements allow. Table A-5 objective 8, described in 6.6.a; applies at levels A, B, C, D, independence required at levels A, B; activities 6.6; outputs: Software Verification Results, and Software Verification Cases and Procedures. Parameter data items were a new topic in the revision.

Maintained by Gerard BlokdykControl text last updated

Other controls in Table A-5: Verification of outputs of software coding and integration processes – DO-178C / ED-12C - Software Considerations in Airborne Systems

Query this from an agent

The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.