Low-level requirements that are derived are identified, given a justification and handed to the system processes, the system safety assessment among them. Table A-2 objective 5, described in 5.2.1.b; applies at levels A, B, C, no independence required; activities 5.2.2.b, 5.2.2.c; outputs Design Description.
The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.