Each migration follows five stages: plan (strategy, provider and service type, roadmap), design (an architecture that embraces the distributed system and trials provider-native features), pilot (a minimum viable product proving the application runs in the cloud), migrate (bring the cloud version to production readiness and port the data) and maintain (keep improving features and performance); the scenarios show patterns such as a reverse proxy during split storage, checksummed and encrypted bulk transfer or out-of-band shipment, caching public content in a content delivery network while keeping controlled information uncached or on an authorised provider, and synthetic monitoring from a SaaS.
The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.