Cefic Responsible Care Management Framework
Appendix 1: Responsible Care key performance indicators – Cefic Responsible Care Management Framework

Cefic Responsible Care Management Framework KPI-4: Use of resources and transport incident KPIs

What does KPI-4 require?

Energy use in gigajoules per year; water withdrawn where applicable and total water consumption in million cubic metres per year; total number of transport incidents and total volume transported in million metric tons per year.

Maintained by Gerard Blokdyk

What else in your programme already covers this

This control maps to 1 controls across 1 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.

ESRS (revised 2026) · 1 control

  • E1-7 E1-7 Energy consumption and mix

Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.

Other controls in Appendix 1: Responsible Care key performance indicators – Cefic Responsible Care Management Framework

Query this from an agent

The graph holds this control, the 1 it maps to, and the evidence behind each claim, over MCP and REST.