Drainage must be positioned, designed and kept in repair so that the risk of contamination is as low as possible. Where feasible, machinery and pipework are arranged so that waste water from the process runs straight to drain, and where large amounts of water are used floors slope adequately towards the drains.
The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.