Australian Information Security Manual
Guidelines for cryptography

Australian Information Security Manual ISM-2073: Post-quantum cryptography transition plan

A post-quantum cryptography transition plan is developed, implemented and maintained.

Maintained by Gerard BlokdykVerified against the published standard Control text last updated

What else in your programme already covers this

This control maps to 7 controls across 2 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.

  • 2.4.13.C.01 2.4.13.C.01 Track developments in next-generation public-key cryptography
  • 2.4.13.C.02 2.4.13.C.02 Inventory long-lived sensitive datasets at harvest risk
  • 2.4.13.C.03 2.4.13.C.03 Inventory systems that use cryptographic technologies
  • 2.4.13.C.05 2.4.13.C.05 Prioritise vulnerable systems for cryptographic transition
  • 2.4.13.C.06 2.4.13.C.06 Factors for prioritising cryptographic transition
  • 2.4.13.C.07 2.4.13.C.07 Plan system transitions to new cryptographic standard
  • 0223 0223 Post-quantum cryptography transition plan

Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.

Other controls in Guidelines for cryptography

Query this from an agent

The graph holds this control, the 7 it maps to, and the evidence behind each claim, over MCP and REST.