Where spatial constraints demand non-TOP SECRET patch panels be installed in the same cabinet as a TOP SECRET patch panel: - a physical barrier in the cabinet is provided to separate patch panels - only personnel holding a Positive Vetting security clearance have access to the cabinet - approval from the TOP SECRET system's authorising officer is obtained prior to installation.
This control maps to 2 controls across 2 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.
Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.
The graph holds this control, the 2 it maps to, and the evidence behind each claim, over MCP and REST.