Australia OGTR Guidelines for Certification of a PC2 Laboratory (Version 3.2)
Part B: Conditions of certification – Australia OGTR Guidelines for Certification of a PC2 Laboratory (Version 3.2)

Australia OGTR Guidelines for Certification of a PC2 Laboratory (Version 3.2) B27: Reviewing the backflow assessment

What does B27 require?

An existing backflow assessment must be reviewed when any new cross-connection, or a device or system able to contaminate the water supply, is connected to the facility's water service, directly or indirectly; or when connections made before certification were judged not to need backflow prevention but a GMO not previously handled, whose risks differ from those of the GMOs assessed at certification, is about to be introduced.

Maintained by Gerard Blokdyk

Other controls in Part B: Conditions of certification – Australia OGTR Guidelines for Certification of a PC2 Laboratory (Version 3.2)

Query this from an agent

The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.