Australia National Construction Code 2025 Volume Three (Plumbing Code of Australia)
Part B6: Rainwater services – Australia National Construction Code 2025 Volume Three (Plumbing Code of Australia)

Australia National Construction Code 2025 Volume Three (Plumbing Code of Australia) B6P4-B6P7: B6P4 to B6P7 Provide access and isolation, identify rainwater pipework and outlets, and avoid uncontrolled discharge

Access must be provided to rainwater service components needing maintenance or replacement and means of isolation to those needing testing, maintenance or replacement; pipes and pipe outlets in the service must be clearly identified; and the likelihood of failure or uncontrolled discharge must be avoided. Deemed-to-Satisfy B6D3 requires pipework and outlet fittings to be marked to AS/NZS 3500.1 and B6D7 requires AS 3959 in designated bushfire prone areas. Victoria adds VIC B6P8: a rainwater service must avoid contaminating its own water, the cold water service or the Network Utility Operator's drinking supply, pose no public health hazard, have no unprotected cross-connection to the drinking supply, and keep a continuous supply for sanitary flushing where a reticulated supply is connected.

Maintained by Gerard Blokdyk

Other controls in Part B6: Rainwater services – Australia National Construction Code 2025 Volume Three (Plumbing Code of Australia)

Query this from an agent

The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.