Australia National Construction Code 2025 Volume Three (Plumbing Code of Australia)
Part B6: Rainwater services – Australia National Construction Code 2025 Volume Three (Plumbing Code of Australia)

Australia National Construction Code 2025 Volume Three (Plumbing Code of Australia) B6P1-B6P2: B6P1 and B6P2 Deliver rainwater at suitable pressure and limit velocity

Points of discharge of a rainwater service must have a working pressure of at least 50 kPa and a static pressure within the building of no more than 500 kPa, or pressures suited to the fixture or appliance, and velocity in rainwater pipework must not exceed 3 metres per second for at least 99 per cent of the peak hour. Deemed-to-Satisfy B6D2 is Section 15 of AS/NZS 3500.1.

Maintained by Gerard Blokdyk

Other controls in Part B6: Rainwater services – Australia National Construction Code 2025 Volume Three (Plumbing Code of Australia)

Query this from an agent

The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.