A duty holder that implements a control measure ensures it is and remains effective, including by keeping it fit for purpose, suitable for the nature and duration of the work, and installed, set up and used correctly.
The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.