The principal contractor puts in place arrangements for compliance at the workplace with Part 3.2 Divisions 2 (general working environment), 3 (first aid), 4 (emergency plans), 5 (personal protective equipment), 7 (airborne contaminants), 8 (hazardous atmospheres), 9 (storage of flammable or combustible substances) and 10 (falling objects), and with Part 4.4 (falls). All PCBUs at the site share these duties.
This control maps to 1 controls across 1 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.
Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.
The graph holds this control, the 1 it maps to, and the evidence behind each claim, over MCP and REST.