Australia Guidance for AI Adoption (2025)
Practice 3: Measure and manage risks – Australia Guidance for AI Adoption (2025)

Australia Guidance for AI Adoption (2025) 3.4.5: 3.4.5 Review risk assessments and treatment plans

Monitor and evaluate risk assessments and treatment plans periodically, and whenever the use case or system changes significantly or new risks are identified, including acting on impact assessments or treatment plans found insufficient.

Maintained by Gerard Blokdyk

What else in your programme already covers this

This control maps to 2 controls across 1 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.

  • 10.4 10.4 Apply the AIAF at lifecycle points and on material change
  • 5.4.2.d 5.4.2 d Reassess risks

Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.

Other controls in Practice 3: Measure and manage risks – Australia Guidance for AI Adoption (2025)

Query this from an agent

The graph holds this control, the 2 it maps to, and the evidence behind each claim, over MCP and REST.