ASIS SPC.1-2009 - Organizational Resilience Standard 4.2.1: 4.2.1 A policy statement meeting fifteen conditions, from life safety first to annual signed review

Within the scope, the policy statement must fit the kind and size of the threats, hazards, risks and impacts faced; put the safety of staff and the community above everything else; commit to continual improvement, to greater sustainability and resilience, to preventing, reducing and mitigating risk and to meeting legal and other obligations; give a basis for setting objectives and targets; be recorded, put into effect and kept up; set out its limits and exclusions; fix and record the level of risk the organization will tolerate; be made known to all who work for the organization or act in its name and be available to stakeholders; name an owner or point of contact; be reviewed on a planned cycle and whenever significant change occurs; and carry top management's signature, with a recorded yearly check that it is still relevant.

Maintained by Gerard BlokdykControl text last updated

What else in your programme already covers this

This control maps to 1 controls across 1 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.

  • 5.2 5.2 A physical asset protection policy meeting eleven conditions

Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.

Other controls in 4.1 and 4.2: General requirements and OR management policy – ASIS SPC.1-2009 - Organizational Resilience Standard