New work is verified by visual inspection and testing before energising; periodic inspection and testing is performed as the regulatory authority requires; visual inspection covers a checklist including protection against external influences and equipment selection.
The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.