No person may use, repair, construct or reconstruct a roadway or alley, or transport materials likely to give off dust, without reasonable precautions (temporary paving, suppressants, wetting, detouring, covering loads); earth or material deposited on paved streets by trucks or earthmoving equipment must be removed by whoever deposited it.
The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.