| nsw-gateway-review-system::DSSA-HC-3.2 | Register the project and start the review six weeks out | The project must first be recorded on the ICT portal (DSSA) before a Health Check review can begin, ideally about six we... |
| nsw-gateway-review-system::DSSA-HC-3.3 | How the agency opens the review through governance | Responsibility for starting the review at the proper moment rests with the delivery agency, or else the accountable agen... |
| nsw-gateway-review-system::DSSA-HC-4.1 | Assess project against scope and objectives | Reviewers should use the workbook to test how effectively the project is managed, judging it against the scope and objec... |
| nsw-gateway-review-system::DSSA-HC-4.2 | Hold interviews and issue the rated report | The reviewer team interviews agency staff and stakeholders, then completes the final draft report, writes the recommenda... |
| nsw-gateway-review-system::DSSA-HC-4.7 | Record assessment of each review objective | For the health check being conducted, the team should mark whether each objective applies, record whether it is met, par... |
| nsw-gateway-review-system::DSSA-HC-7.10.1 | Project viability maintained | The agency should show the project is still worth continuing, with any change to requirements since the fourth gate prop... |
| nsw-gateway-review-system::DSSA-HC-7.10.10 | Super user support after go live | The agency should demonstrate that support is in place once the service is live, with a defined support strategy and sup... |
| nsw-gateway-review-system::DSSA-HC-7.10.11 | Development held to the MVP | The agency should show that any work still under way remains aimed at the minimum viable product, evidenced by the contr... |
| nsw-gateway-review-system::DSSA-HC-7.10.12 | Authority for decisions and budget | The agency should show who is authorised to make which decisions and who holds budget authority, as recorded in the busi... |
| nsw-gateway-review-system::DSSA-HC-7.10.13 | Operating model resourced for the MVP | The agency should show that the live service operating model supplies the people and capability the minimum viable produ... |
| nsw-gateway-review-system::DSSA-HC-7.10.14 | Business users able to drive change | The agency should demonstrate that business users can bring about change where it is needed, with evidence that product... |
| nsw-gateway-review-system::DSSA-HC-7.10.15 | Continual development and portfolio growth | The delivery agency should explain how the service will keep developing after launch and how its collection of Digital b... |
| nsw-gateway-review-system::DSSA-HC-7.10.16 | Benefits reviewed and tracked | The agency should show that business benefits are being reviewed and tracked as delivery proceeds, with benefits managem... |
| nsw-gateway-review-system::DSSA-HC-7.10.17 | Time for integration and readiness testing | The agency should show that enough time and resource is set aside for testing product integration and operational readin... |
| nsw-gateway-review-system::DSSA-HC-7.10.18 | End users prepared for transition | The agency should demonstrate that end users are prepared for the move to the new or redesigned digital service, with us... |
| nsw-gateway-review-system::DSSA-HC-7.10.2 | Business need still met | The agency should show that what it is building answers the business need, with confirmation that stakeholders have appr... |
| nsw-gateway-review-system::DSSA-HC-7.10.3 | Business case remains valid | The agency should demonstrate that the case for the investment still holds, through an updated project plan, and program... |
| nsw-gateway-review-system::DSSA-HC-7.10.4 | Changes between award and transition | The agency should show whether anything changed between signing the contract and finishing transition and testing that a... |
| nsw-gateway-review-system::DSSA-HC-7.10.5 | Ready for business change | The agency should show it is prepared for the change the new service brings, with agreed plans for preparing the busines... |
| nsw-gateway-review-system::DSSA-HC-7.10.6 | Implement while keeping services running | The agency should demonstrate it can bring the new solution in while existing services continue, supported by a resource... |
| nsw-gateway-review-system::DSSA-HC-7.10.7 | Team skills and experience | The agency should show the project team has the skill and experience the work needs, with internal and external commitme... |
| nsw-gateway-review-system::DSSA-HC-7.10.8 | Benefit changes affecting project value | The agency should show whether the benefits forecast in the business case have moved in a way that alters what the inves... |
| nsw-gateway-review-system::DSSA-HC-7.10.9 | Strategy for planning and managing benefits | The delivery agency should point to a current strategy for planning and managing benefits, a register of the benefits id... |
| nsw-gateway-review-system::DSSA-HC-7.11.1 | Service meets acceptance criteria | The agency should show the whole service or facility satisfies the acceptance criteria, including justification and auth... |
| nsw-gateway-review-system::DSSA-HC-7.11.10 | Alignment with the sustainability plan | The agency should show how the project fits with the NSW Government Sustainability Plan, or with the sustainability poli... |
| nsw-gateway-review-system::DSSA-HC-7.11.11 | E waste policy considered | The agency should show that where an existing system or ICT infrastructure is being replaced, NSW e waste policies have... |
| nsw-gateway-review-system::DSSA-HC-7.11.12 | Whole of government ICT compliance | The agency should show the project conforms with whole of government ICT policy, standards and priorities, supported by... |
| nsw-gateway-review-system::DSSA-HC-7.11.13 | Non functional requirements tested | The agency should show that non functional requirements can be tested and that provision for that testing exists, with t... |
| nsw-gateway-review-system::DSSA-HC-7.11.14 | Progress tracked, reported and corrected | The agency should demonstrate that progress is monitored, reported and put back on course, with backlogs watched and rea... |
| nsw-gateway-review-system::DSSA-HC-7.11.15 | Legacy data transfer and exit | The agency should show how data will be moved from legacy systems, how those systems will be integrated with and eventua... |
| nsw-gateway-review-system::DSSA-HC-7.11.16 | Incremental planning load | The agency should show that its incremental planning is not overloading either the people or the timetable, using progre... |
| nsw-gateway-review-system::DSSA-HC-7.11.17 | Contingency for non digital users | The agency should show what contingency exists and what it will cost for people who cannot or will not use digital servi... |
| nsw-gateway-review-system::DSSA-HC-7.11.18 | Change managed and controlled | The agency should show that change is managed and controlled effectively, evidenced by a detailed change management stra... |
| nsw-gateway-review-system::DSSA-HC-7.11.19 | Lessons from past releases | The agency should show that lessons from earlier or public releases are identified, captured, kept and shared systematic... |
| nsw-gateway-review-system::DSSA-HC-7.11.2 | Running to plan and budget | The agency should demonstrate delivery against the agreed plan and budget, with cost and schedule reconciliations, a cur... |
| nsw-gateway-review-system::DSSA-HC-7.11.20 | Communications for releases and go live | The agency should show that communications for releases and the move to live are planned, with non functional requiremen... |
| nsw-gateway-review-system::DSSA-HC-7.11.21 | When releases cease | The agency delivering the project should be able to state where releases stop and routine operational support and mainte... |
| nsw-gateway-review-system::DSSA-HC-7.11.3 | Stakeholder issues addressed | The agency should show that every stakeholder issue raised has been dealt with, with progress reports issued through the... |
| nsw-gateway-review-system::DSSA-HC-7.11.4 | Testing and commissioning completed | The agency should show that all testing, commissioning and acceptance or transition procedures for the new system, servi... |
| nsw-gateway-review-system::DSSA-HC-7.11.5 | Parties accept commissioning results | The agency should show that all parties have accepted the relevant commissioning or test results and that any resulting... |
| nsw-gateway-review-system::DSSA-HC-7.11.6 | Contingency, continuity and rollback plans | The agency should show tested plans for contingency, continuity and rollback covering rollout, implementation and operat... |
| nsw-gateway-review-system::DSSA-HC-7.11.7 | Parties agree change and migration plans | The agency should demonstrate that internal and external parties have agreed the change management, migration and data t... |
| nsw-gateway-review-system::DSSA-HC-7.11.8 | Contract changes recorded and approved | The agency should show that any change to the contract since award has been anticipated, written down and authorised, wi... |
| nsw-gateway-review-system::DSSA-HC-7.11.9 | Ready to manage the contract operationally | The agency should show it is ready to run the contract once live, with clarity on how far the future contract management... |
| nsw-gateway-review-system::DSSA-HC-7.12.1 | Award phase risks resolved | The agency should show that the risks and issues recorded at contract award have been resolved, with nothing from that p... |
| nsw-gateway-review-system::DSSA-HC-7.12.2 | Implementation risks identified and managed | The agency should show that risks and issues arising from implementation are identified and handled, with nothing left u... |
| nsw-gateway-review-system::DSSA-HC-7.12.3 | Risk of proceeding versus delaying | The agency should show what risk attaches to going ahead rather than waiting when issues remain unresolved, with a risk... |
| nsw-gateway-review-system::DSSA-HC-7.12.4 | Budget control and burn rate | The agency should show the budget is under control and to explain whether a higher rate of spend, for example on develop... |
| nsw-gateway-review-system::DSSA-HC-7.2.1 | Business need and strategic fit | The agency should show from its business case that the investment answers a real business need that survives shifts in o... |
| nsw-gateway-review-system::DSSA-HC-7.2.10 | Stakeholder support and agency commitment | The agency should demonstrate that stakeholders have been involved and have endorsed the project with roles and responsi... |
| nsw-gateway-review-system::DSSA-HC-7.2.11 | Benefits agreed and realisation planned | The agency should show benefits stated plainly and agreed with stakeholders, a first plan for delivering and measuring t... |
| nsw-gateway-review-system::DSSA-HC-7.2.12 | Change plan developed with business units | The agency should show a plan for managing change, developed with the affected business units, one that captures stakeho... |
| nsw-gateway-review-system::DSSA-HC-7.2.13 | Changes across business areas managed | The agency should describe how changes inside and outside the agency are identified, judged, communicated and controlled... |
| nsw-gateway-review-system::DSSA-HC-7.2.14 | Benefit changes and management strategy | The agency should be able to say whether benefit expectations have moved in a way that alters value, and to show a curre... |
| nsw-gateway-review-system::DSSA-HC-7.2.15 | Capability and capacity assessed | The agency should show that capability and capacity have been assessed for build, run and business readiness, and that t... |
| nsw-gateway-review-system::DSSA-HC-7.2.16 | Cyber work reflected in delivery strategy | The agency should show the delivery approach accounts for cyber security work, the people it needs, and when that work m... |
| nsw-gateway-review-system::DSSA-HC-7.2.17 | Resources to sustain momentum | The agency should show a resourcing plan matched to the demand profile, and evidence that the multidisciplinary teams ar... |
| nsw-gateway-review-system::DSSA-HC-7.2.18 | Emerging benefits fed into the case | The agency should explain how new benefits or dis-benefits are picked up as they appear and carried into the business ca... |
| nsw-gateway-review-system::DSSA-HC-7.2.19 | Roles, responsibilities and delegations | The agency should show an organisational model that sets out who does what and where decision rights sit, and to let the... |
| nsw-gateway-review-system::DSSA-HC-7.2.2 | Preferred option still appropriate | The agency should explain why the chosen option remains the best of those available, given its reliance on other program... |
| nsw-gateway-review-system::DSSA-HC-7.2.20 | Training for service and front-line staff | The agency should show how people who will run and use the service are trained, including a demand profile of the skills... |
| nsw-gateway-review-system::DSSA-HC-7.2.21 | Business change management processes | The agency should show that change runs through defined processes, including watching the product backlog and escalating... |
| nsw-gateway-review-system::DSSA-HC-7.2.22 | Business users empowered to drive change | The agency should show that business users, and product managers in particular, hold enough authority and standing to ma... |
| nsw-gateway-review-system::DSSA-HC-7.2.23 | Progress tracked, reported and corrected | The agency should show how progress is tracked, reported and corrected, covering backlog monitoring with evidence of rea... |
| nsw-gateway-review-system::DSSA-HC-7.2.3 | Whole-life value for money | The agency should show that the chosen option offers better value to the state or taxpayer across the investment's life.... |
| nsw-gateway-review-system::DSSA-HC-7.2.4 | Costs within budget and funding affordable | The agency should be able to reconcile projected whole-life cost against the funding available, show that stakeholders h... |
| nsw-gateway-review-system::DSSA-HC-7.2.5 | Realistic view of ability to succeed | The agency should be able to give an honest reading of its own capacity to deliver, drawing on comparisons with similar... |
| nsw-gateway-review-system::DSSA-HC-7.2.6 | Total project scope defined | The agency should produce a current statement of total scope that covers the business change as well as the technology b... |
| nsw-gateway-review-system::DSSA-HC-7.2.7 | Security requirements identified early | The agency should show that security and information security specialists were engaged early and initial requirements ca... |
| nsw-gateway-review-system::DSSA-HC-7.2.8 | Cyber protection costs included | The agency should show that both direct and indirect cyber protection costs are budgeted, covering integration with the... |
| nsw-gateway-review-system::DSSA-HC-7.2.9 | Business change risks in an initial plan | The agency should show that risks and issues arising from business change are recorded with an owner and a management pl... |
| nsw-gateway-review-system::DSSA-HC-7.3.1 | Project under control | The agency should show, from its budget and timetable reporting, that the work is running to plan and that spending sits... |
| nsw-gateway-review-system::DSSA-HC-7.3.2 | Causes of budget and schedule deviation | The agency should explain why any over or under run has happened, reconciling the position against budget and time plan... |
| nsw-gateway-review-system::DSSA-HC-7.3.3 | Actions to prevent repeat deviation | The agency should show what will stop the same deviation recurring, with project management documentation reviewed and u... |
| nsw-gateway-review-system::DSSA-HC-7.3.4 | Assumptions from Gate 2 verified | The agency should show that assumptions recorded at the second gate have been tested, with a log of those still open, ho... |
| nsw-gateway-review-system::DSSA-HC-7.3.5 | Time to fix faults and manage slippage | The agency should show there is room in the plan to fix defects, that progress is being watched, and that controls rank... |
| nsw-gateway-review-system::DSSA-HC-7.3.6 | Incremental planning load on team | The agency should show whether the incremental planning approach is placing too much strain on the team or the timetable... |
| nsw-gateway-review-system::DSSA-HC-7.3.7 | Budget control and spend rate | The agency should show the budget is controlled and to explain any need for a faster spend rate to hold development pace... |
| nsw-gateway-review-system::DSSA-HC-7.4.1 | Options tested against needs and priorities | The agency should show that every delivery option was tested against the agency's business needs and the relevant govern... |
| nsw-gateway-review-system::DSSA-HC-7.4.10 | Knowledge of the supplier market | The agency should show it knows the supplier market, existing and potential, through commercial intelligence and market... |
| nsw-gateway-review-system::DSSA-HC-7.4.11 | Robust contract management strategy | The agency should show a contract management strategy that covers the skills it needs as an intelligent customer, the re... |
| nsw-gateway-review-system::DSSA-HC-7.4.12 | Evaluation strategy accepted and compliant | The agency should show an evaluation strategy, including its method for demonstrating value for money, that stakeholders... |
| nsw-gateway-review-system::DSSA-HC-7.4.13 | Whole-of-government ICT policy alignment | The agency should show, using the agency self-assessment template, that the project aligns with whole-of-government ICT... |
| nsw-gateway-review-system::DSSA-HC-7.4.2 | Shared understanding of business needs | The agency should show that the agency and the project team share one understanding of the need, expressed as defined ou... |
| nsw-gateway-review-system::DSSA-HC-7.4.3 | Requirements specification matches outcomes | The agency should show a requirement specification that matches the intended outputs and outcomes, endorsed by stakehold... |
| nsw-gateway-review-system::DSSA-HC-7.4.4 | Sourcing options evaluated | The agency should show that sourcing routes were assessed, covering internal resources, single or multiple suppliers, co... |
| nsw-gateway-review-system::DSSA-HC-7.4.5 | Market appetite for the requirement | The agency should show the market is likely to respond, using soundings that cover recent similar procurements or a view... |
| nsw-gateway-review-system::DSSA-HC-7.4.6 | Procurement approach and state rules | The agency should show the procurement route was assessed and follows state procurement rules. Related risks such as tim... |
| nsw-gateway-review-system::DSSA-HC-7.4.7 | Defined delivery strategy | The agency should show a delivery strategy set out clearly, with the reason for the chosen route recorded and agreed wit... |
| nsw-gateway-review-system::DSSA-HC-7.4.8 | Delivery strategy influences addressed | The agency should show the factors that shape the delivery approach were worked through, including how efficient and pre... |
| nsw-gateway-review-system::DSSA-HC-7.4.9 | The strategy supports communication and joint working | The agency should show that its approach supports communication and joint working, that support mechanisms and a communi... |
| nsw-gateway-review-system::DSSA-HC-7.5.1 | Risks identified and financially evaluated | The agency should show that major risks and issues are logged regularly across strategic, political, commercial and legi... |
| nsw-gateway-review-system::DSSA-HC-7.5.2 | Risk management plans in place | The agency should show a risk management strategy built on good practice, a plan for each risk with responsibility alloc... |
| nsw-gateway-review-system::DSSA-HC-7.5.3 | Issues satisfactorily resolved | The agency should show that issues raised have been dealt with, with the risk and issue logs reviewed regularly by the t... |
| nsw-gateway-review-system::DSSA-HC-7.5.4 | External issues and plans for stakeholders | The agency should show that external matters including statutory processes, environmental concerns and communications ar... |
| nsw-gateway-review-system::DSSA-HC-7.5.5 | Staff exhaustion risk and mitigation | The agency should show a clear position on the risk of staff exhaustion with mitigation defined, and to provide detail o... |
| nsw-gateway-review-system::DSSA-HC-7.6.1 | Project still required | The agency should demonstrate that the investment remains consistent with its own goals and with NSW Government prioriti... |
| nsw-gateway-review-system::DSSA-HC-7.6.10 | Change management with business units | The agency should show a change management approach built with stakeholders that captures their views, the process and o... |
| nsw-gateway-review-system::DSSA-HC-7.6.11 | Changes across business areas managed | The agency should demonstrate an approach, built with stakeholders, for spotting, weighing, communicating and controllin... |
| nsw-gateway-review-system::DSSA-HC-7.6.12 | Benefit changes and project value | The agency should show whether the benefits set out in the business case have moved and what that does to the value of t... |
| nsw-gateway-review-system::DSSA-HC-7.6.13 | Strategy for planning benefits | The delivery agency should have a strategy for planning and governing benefits and be able to evidence which benefits ha... |
| nsw-gateway-review-system::DSSA-HC-7.6.14 | Supplier delivery capability verified | The agency should show that it has tested the preferred supplier's capacity to deliver to the schedule and outcomes the... |
| nsw-gateway-review-system::DSSA-HC-7.6.15 | Supplier timeline and variation impacts | The agency should demonstrate how the supplier will hold to the project timetable and that variations already identified... |
| nsw-gateway-review-system::DSSA-HC-7.6.16 | Remaining build limited to MVP | The agency should show that remaining build work is confined to the minimum viable product, with product backlogs under... |
| nsw-gateway-review-system::DSSA-HC-7.6.17 | Decision and budget delegations defined | The delivery agency should point to defined decision and budget delegations for individuals and groups, recorded in the... |
| nsw-gateway-review-system::DSSA-HC-7.6.18 | Live operating model supports MVP | The agency should show that the operating model for the live service can support the minimum viable product, with resour... |
| nsw-gateway-review-system::DSSA-HC-7.6.19 | Business users empowered | The agency should demonstrate that business users, through their product managers, hold the authority needed to drive ch... |
| nsw-gateway-review-system::DSSA-HC-7.6.2 | Business case completeness | The delivery agency should table a current business case that has been retested against strategy, economics, finances, c... |
| nsw-gateway-review-system::DSSA-HC-7.6.20 | Service growth and digital portfolio | The delivery agency should explain how the service will keep evolving and how its portfolio of Digital by Default servic... |
| nsw-gateway-review-system::DSSA-HC-7.6.21 | Benefits tracked and reviewed | The agency should show that benefits are reviewed and tracked under arrangements that adapt as circumstances change. |
| nsw-gateway-review-system::DSSA-HC-7.6.22 | Integration and readiness testing allowance | The delivery agency should provide for integration and operational readiness testing beyond what happens inside developm... |
| nsw-gateway-review-system::DSSA-HC-7.6.23 | End users prepared for transition | The agency should demonstrate that end users are being prepared for the move to the new or redesigned service, supported... |
| nsw-gateway-review-system::DSSA-HC-7.6.3 | Preferred option meets the need | The agency should show that the original objectives have been tested again against the winning bid and the solution it p... |
| nsw-gateway-review-system::DSSA-HC-7.6.4 | Most appropriate option chosen | The agency should show the cost, benefit and risk comparison re-run with the final bid, and that sensitivity testing sup... |
| nsw-gateway-review-system::DSSA-HC-7.6.5 | Commercial deal offers whole-life value | The agency should demonstrate that the commercial deal offers value and quality across the whole contract term, tested a... |
| nsw-gateway-review-system::DSSA-HC-7.6.6 | Realistic about managing change | The agency should show that it understands its own culture and capacity, has compared itself with comparable projects, a... |
| nsw-gateway-review-system::DSSA-HC-7.6.7 | Full case remains affordable | The agency should demonstrate that the full business case, once delivery plans and bid prices are folded in, stays affor... |
| nsw-gateway-review-system::DSSA-HC-7.6.8 | Agreed benefits realisation plan | The delivery agency should produce an agreed plan for realising benefits, covering critical success factors, named owner... |
| nsw-gateway-review-system::DSSA-HC-7.6.9 | Stakeholder involvement and approvals | The agency should show that stakeholders and business or user representatives took part in evaluation and quality review... |
| nsw-gateway-review-system::DSSA-HC-7.7.1 | Project under control | The agency should show the project is tracking to its schedule and budget and that recommendations from earlier reviews... |
| nsw-gateway-review-system::DSSA-HC-7.7.10 | E-waste policy for replaced systems | Where an existing system or ICT infrastructure is being replaced, the agency should show how NSW e-waste policy has been... |
| nsw-gateway-review-system::DSSA-HC-7.7.11 | Whole-of-government ICT alignment | The agency should show the project meets whole-of-government ICT policy, standards and priorities, evidenced by a comple... |
| nsw-gateway-review-system::DSSA-HC-7.7.12 | Non-functional requirements testable | The agency should show that non-functional requirements can be tested, that their origin and validity are clear, and tha... |
| nsw-gateway-review-system::DSSA-HC-7.7.13 | Progress tracked and corrected | The delivery agency should track, report and correct progress, with backlogs monitored, earned value measured properly a... |
| nsw-gateway-review-system::DSSA-HC-7.7.14 | Legacy systems and data transfer plans | The agency should show that plans covering legacy systems and the transfer of data exist and have been reviewed for viab... |
| nsw-gateway-review-system::DSSA-HC-7.7.15 | Incremental planning within capacity | The agency should demonstrate that its incremental planning is not stretching people or the schedule beyond capacity, su... |
| nsw-gateway-review-system::DSSA-HC-7.7.16 | Contingency for non-digital users | The agency should show that contingency plans and estimates exist for people who still need non-digital services, and th... |
| nsw-gateway-review-system::DSSA-HC-7.7.17 | Change managed effectively | The agency should demonstrate effective change management through a suitably detailed strategy and a log recording when,... |
| nsw-gateway-review-system::DSSA-HC-7.7.18 | Lessons from earlier releases | The agency should show that lessons from earlier or public releases have been identified, captured, retained and applied... |
| nsw-gateway-review-system::DSSA-HC-7.7.19 | Release and transition communications | The agency should show what communication is planned around releases and live transition, including how a surge in deman... |
| nsw-gateway-review-system::DSSA-HC-7.7.2 | Causes of deviation explained | The delivery agency should explain what drove any over or under run, supported by reconciliations against the budget and... |
| nsw-gateway-review-system::DSSA-HC-7.7.20 | End of release activity and handover | The delivery agency should state the point at which release work stops and routine support and maintenance take over, wi... |
| nsw-gateway-review-system::DSSA-HC-7.7.3 | Actions to stop repeat deviation | The agency should show what it will do to prevent the same deviations appearing in later phases, with the analysis and p... |
| nsw-gateway-review-system::DSSA-HC-7.7.4 | Earlier assumptions validated | The agency should show that assumptions carried forward from earlier reviews have been tested, that untested ones sit in... |
| nsw-gateway-review-system::DSSA-HC-7.7.5 | Procurement and technical checks completed | The agency should demonstrate that bid management review and approval ran, that state procurement rules were followed, t... |
| nsw-gateway-review-system::DSSA-HC-7.7.6 | Delivery strategy followed | The delivery agency should confirm that the team worked to the agreed delivery strategy and plan. |
| nsw-gateway-review-system::DSSA-HC-7.7.7 | Documents quality reviewed | The agency should show that project documents went through quality review. |
| nsw-gateway-review-system::DSSA-HC-7.7.8 | Probity issues managed | The agency should demonstrate that probity concerns in the procurement were managed, with sign-off from a probity advise... |
| nsw-gateway-review-system::DSSA-HC-7.7.9 | Alignment with sustainability plan | The delivery agency should explain how the project lines up with the NSW Government Sustainability Plan, or with relevan... |
| nsw-gateway-review-system::DSSA-HC-7.8.1 | Solution meets the business need | The agency should show the proposed solution satisfies every requirement, functional and non-functional, and that stakeh... |
| nsw-gateway-review-system::DSSA-HC-7.8.10 | Technical implications assessed | The agency should demonstrate that technical consequences have been assessed, including information assurance and securi... |
| nsw-gateway-review-system::DSSA-HC-7.8.11 | Team skills and experience | The agency should show the project team has the skills and experience to deliver the investment outcomes, with capabilit... |
| nsw-gateway-review-system::DSSA-HC-7.8.2 | Alternative supplier options assessed | The agency should show whether suppliers or partners put forward alternatives alongside a fully compliant bid, and that... |
| nsw-gateway-review-system::DSSA-HC-7.8.3 | Solution delivers the full case need | The agency should demonstrate, in business outcome terms, that the proposal will deliver what the full business case des... |
| nsw-gateway-review-system::DSSA-HC-7.8.4 | Business change strategy updated | The agency should show that the business change plan has been updated to reflect the proposed solution, agreed by the bo... |
| nsw-gateway-review-system::DSSA-HC-7.8.5 | Benefits and budgets updated | The agency should show how the proposal affected expected benefits or budget, with an updated realisation plan, differen... |
| nsw-gateway-review-system::DSSA-HC-7.8.6 | Ready for build and transition | The agency should show that it and the supplier are ready for development, implementation, transition and operation, wit... |
| nsw-gateway-review-system::DSSA-HC-7.8.7 | Change strategy agreed by all | The agency should show a change management strategy agreed by every party, the supplier included. |
| nsw-gateway-review-system::DSSA-HC-7.8.8 | Responsibilities and liabilities allocated | The agency should demonstrate that roles, responsibilities and contractual liabilities are allocated between the parties... |
| nsw-gateway-review-system::DSSA-HC-7.8.9 | Resources for supplier obligations | The agency should show that the resources the supplier needs to meet its contractual obligations are identified, agreed... |
| nsw-gateway-review-system::DSSA-HC-7.9.1 | Risk and issue plans current | The agency should show that risk and issue management plans are current, with the register and log reviewed, updated and... |
| nsw-gateway-review-system::DSSA-HC-7.9.2 | Major phase risks resolved | The agency should demonstrate that major risks arising in this phase have been resolved or are being managed, covering f... |
| nsw-gateway-review-system::DSSA-HC-7.9.3 | Continuity and contingency arrangements | The agency should show continuity and contingency arrangements that limit the harm from major problems during implementa... |
| nsw-gateway-review-system::DSSA-HC-7.9.4 | Contract terms and risk allocation | The agency should demonstrate that the contract reflects standard terms and conditions, that any departures were assesse... |
| nsw-gateway-review-system::DSSA-HC-7.9.5 | Re-competition for long contracts | For long term service or partnering contracts, the agency should show that re-competition has been thought through, with... |
| nsw-gateway-review-system::DSSA-HC-7.9.6 | Budget controlled and burn rate | The agency should show the budget is controlled and that any higher spending rate needed to keep pace, for example on de... |
| nsw-gateway-review-system::INSW-HC-INITIATING-THE-REVIEW | Starting the Health Check review | The delivery agency begins by contacting the relevant GCA Review Manager, once its own governance structure has authoris... |
| nsw-gateway-review-system::INSW-HC-KFA1 | Delivery scope aligned to service need | At this review the agency should show that the scope being delivered still matches what was procured and serves the need... |
| nsw-gateway-review-system::INSW-HC-KFA2 | Affordability and value for money | The agency should demonstrate that projections of cost to completion are current, match the accepted tender and the appr... |
| nsw-gateway-review-system::INSW-HC-KFA3 | Social, environmental and economic sustainability | The agency should show a robust and transparent process for meeting planning and environmental approval conditions, incl... |
| nsw-gateway-review-system::INSW-HC-KFA4 | Accountabilities and governance structure | The agency should demonstrate a formal delivery governance structure suited to the project, with the owner of the asset,... |
| nsw-gateway-review-system::INSW-HC-KFA5 | Live risk management and mitigation | The agency should show a live risk register with evidence of proactive and cooperative mitigation, a government and cont... |
| nsw-gateway-review-system::INSW-HC-KFA6 | Interfaces and stakeholder management | The agency should show how stakeholder management responsibilities are divided and how well that arrangement performs, w... |
| nsw-gateway-review-system::INSW-HC-KFA7 | Change management and asset owner needs | The agency should show the asset owner and operator engaged at a level suited to the lifecycle stage, end user needs ref... |
| nsw-gateway-review-system::INSW-HC-MANDATORY-DOCUMENTS | Required information and mandatory documents | Before the review the delivery agency must provide a project presentation giving an executive overview and the Cost Data... |