Precondition (mandatory for certification). The project maps acoustic zones on plans (loud, quiet, mixed, circulation and not applicable) with a plan to reprogramme or mitigate sound transfer where loud zones border quiet ones, and provides an acoustic design plan from the team or owner, or an acoustics professional's report, addressing background noise, speech privacy, reverberation and impact noise. Parts: Label Acoustic Zones; Provide Acoustic Design Plan.
The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.