Where a network or service includes tools that enable real-time monitoring or analysis of its use or operation, or monitoring or analysis of signal content, the provider must identify and reduce the risk arising if the tools are stored on equipment outside the UK, and must ensure the tools cannot be accessed from, and are not stored on equipment in, a country listed in the Schedule (China, Iran, North Korea and Russia).
The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.