UK Construction (Design and Management) Regulations 2015 (CDM 2015)
Part 4 General Requirements for Construction Sites

UK Construction (Design and Management) Regulations 2015 (CDM 2015) CDM-R24: Reports of Inspection

A competent person must inspect specified workplaces at defined intervals and prepare written reports identifying any defects or risks requiring action.

Maintained by Gerard BlokdykVerified against the published standard Control text last updated

Other controls in Part 4 General Requirements for Construction Sites

Query this from an agent

The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.