UK Construction (Design and Management) Regulations 2015 (CDM 2015) 15.4-6: Single-contractor projects

What does 15.4-6 require?

Where it is the only contractor, the contractor applies the general principles of prevention to planning work and timing and draws up a construction phase plan meeting regulation 12(2) as soon as practicable before setting up the site.