Weight of hazardous and non-hazardous waste generated by type (tonnes, per sector guidance); disposed of, split into incinerated with and without energy recovery, landfilled and other disposal; and diverted from landfill, split into reused, recycled and other recovery (GBF Targets 7 and 11). Reported under Metrics and targets B on a comply or explain basis.
This control maps to 1 controls across 1 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.
Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.
The graph holds this control, the 1 it maps to, and the evidence behind each claim, over MCP and REST.